Site icon Baltimore Chronicle

Kiev's renovated metro station has its first trial run, – Klitschko

At the end of the 31st sickle near Kiev there is a new plot between the Lib metro stations ідська” – “Demiivska “The first test train has passed. In its warehouse there is also a special car that checks the new track bed, protecting it to ensure that the correct track width is adjusted to prevent possible subsidence.

RBC-Ukraine reports about this due to the measures taken in the capital Italy Nickname on Telegram.< /p>

To launch the first test train, a complex of preparatory robots was built using the obtained design of the working tunnel with a new part of the tunnel and the sections that were built by Klitschko.

In his words, carefully, laid all the necessary electrical cables, alarms and connections; We carried out the installation and connection of the contact rail, which provides life for the trains, installation and adjustment of safety systems for the trains.

In the future, before the full-scale disruption of trains with passengers, it is important to check the engineers and safety systems at this hour.

“Work is carried out in the cycle mode so that in the near future go rokh poezdiv”, – writing Klitschko.

Guess what, the repairs at the site between the Libidska and Teremki metro stations near Kiev began as a result of a bygone fate through water penetration in the tunnel.

Last year Tizhny Klitschko, having reported that the current workers on the deteriorating section of the “blue” metro line are reaching the end, have lost the ability to develop landscaping areas. Internal robots in the new part of the tunnel will continue so that the metro will return to the beginning of autumn.

Read the terms and important information about the war between Russia and Ukraine on the RBC-Ukraine channel in Telegram.

Exit mobile version