Private enterprise “Altair” officially released information about the dismantling behind the address vul. Sichovykh Striltsiv, 91. As representatives of the company stated, the activists’ statements do not reflect the effectiveness and super-reading of the actual speeches – I will not bear it, but in fact renew it.
RBC reports about this -Ukraine with the company posted on Facebook.
“Our meta lies in the preserved future of the camp in which it was built and was forced into further ruin,” according to the company’s statement.
Due to the act of fastening carried out in the 2018 cohort, the booths were declared emergency, and the fire that occurred in the 2019 cohort further complicated the situation. At the latest laboratory of the municipal enterprise “Kyivzhitlospetsekspluatatsiya” the technical mill of the booth “threatens the collapse of load-bearing and fencing structures” and it was recommended to carry out a number of visits, including repair the external walls, foundation, replace the structure with the ceiling and cover etc.
Some of these work, including replacement of the roof and renovation of the surrounding structures, were carried out immediately and in private. The production of “Altair”, and even in the clear case, the elements would threaten the insecurity of those absent and further operation of the facility would be impossible. Alemov is not talking about dismantling the new everyday life.
“We agree that everyday robots do not lead to changes in geometric or functional significance. travel passport about “Ektu” – they say in the company.
Previously, it was reported about the attempt to dismantle the former Lukyanivka police station, built in 1901. Regardless of its historical character, it is not an architectural monument and in 2021 it was sold to the Altair Private Enterprise already in emergency condition.
Terminovy and important information about Read the war between Russia and Ukraine on the RBC channel -Ukraine on Telegram.