The Ministry of Energy of Ukraine praised the new Instruction on storage and stagnation yearly power supply schedules. However, new principles for establishing schedules in all areas have been transferred.
RBC-Ukraine informs about this from a message to the Ukrenergo press service.
As stated in the press service, all operators of the distribution system (oblenergo) adapt your schedules to new possibilities.
What to change for casual workers
- Weather schedules connection (GPV) in all areas will be unified. The skin group takes up a clear hour according to the division according to the criteria of day/night, weekday/weekend.
- The skin group of the GPV will be further divided into two sections. For example, if there is a lot of damage to one drawer, the dispatcher can issue a command to shoot 0.5 drawers, or 2.5 draws – if 2 drawers are not enough.
- For the recovery and healing of subscribers, up to 30 hours are officially allocated.
As stated in the press service, the remaining virulence of trivalities will not be expected to be stored behind the bags of the day. And for this reason, as before, we will respond to the energy sector.
Ukrenergo guessed that there is a war in the minds of the people, as a result of systematic hostile attacks on energy facilities, which are possible not only now, but Emergency power outages.
Changes for industry and business
The control over the stagnation of stress exchange schedules (GOP) for industrial production will be strengthened. If enterprises/legal entities do not issue a command about the stagnation of the GOP – the operators of the distribution system (oblenergo) can independently stagnate the emergency shutdown schedules for the sake of those companions who are connected to Their measure. And the transmission system operator should establish an emergency shutdown schedule (ASS) for those people who are connected to the main lines.
It seems that the GPV is a group of everyday people and business, How many megawatts are there? All duties are subject to closure of schedules of daily switching-off of divisions for 6 straight days.
Before the GPV, critically important objects, which may ensure priority power supply, are not switched on up to the set minimum intensity. The transfer of such objects is confirmed by the administration.
Ukraine passed the spring without a schedule for turning on the lights. The lights began to be turned on after the massive attack on the 17th leaf fall.